For EPA updated info on PFAS please click here.

For more information on the East Street School and John Pettibone Community Buildings, Click Here.

BE IN THE KNOW --Click here to sign up for Town Alerts with Notify New Milford

MANTENTE INFORMADO --Haga clic aqui para suscribirse a los alertas de la ciudad con Notify New Milford

bg

Highway Department

The Highway Department is responsible for the maintenance, drainage and snow plowing for all 181 miles of paved roads and 26 miles of gravel roads throughout Town. Department responsibilities include sweeping, gravel road grading, pothole patching, drainage maintenance and installation, roadside mowing, sign maintenance, catch basin maintenance, curbing repairs and responding to customer service requests through the self-report See Click Fix program. In 2023 staff responded to over 337 requests from residents though the SCF program as well as many others reported by other means. Additionally, the department runs a full tree crew complete with bucket truck, chipper and stump grinder to keep roadways clear and safe, runs an in-house paving program to overlay roads and the Town’s Fleet Maintenance Shop to handle maintenance and repairs on Town vehicles.  

In addition to the routine work, the Department is available to respond 24/7 to emergencies such as winter weather, fallen trees and vehicle accident clean-ups.  

The Highway Department consists of a Highway Foreman, Deputy Highway Foreman, twenty-eight Highway Maintenance personnel, a Head Mechanic and four Mechanics. The Department’s Fleet consists of twenty-four CDL dump trucks, one 10 wheel dump truck, five mason dumps, two front end loaders, two graders, one backhoe, three excavators, three sweepers, one skid steer, a paver, three rollers, a Vactor, a Durapatcher, four roadside mowers and a multitude of other small equipment. 

 

 

https://www.facebook.com/NMPWD/

REQUEST A SERVICE - Town of New Milford

REQUEST A SERVICE - CT DOT - State Roads

Report a power outage, wires down, or tree in wires.

 

Frequently Asked Questions FAQs 

Drainage - repair and replacement of storm drainage is ongoing

Gravel road drainage and grading - 27 miles on a 6-7 week cycle - weather and equipment permitting

Department Documents

  For further questions, please contact us at (860)355-6040 or use the additional links.

Additional Links

Contact Information

Phone: (860) 355-6045 
Main Office: (860) 355 -6040
Fax: (860) 355-6055
Email: public_works@newmilfordct.gov 

Hours: 

6:30am -3:00pm M-F 

 

Highway Foreman:

Michael Boucher

Email: MBoucher@newmilfordct.gov

 

Deputy Highway Foreman:

Chris Jurgens

Email: ChJurgens@newmilfordct.gov

Monday through Thursday, Oct. 27-30, there will be a private contractor performing an inspection of Veteran's Bridge between 9 am and 3 pm